MyEco



Utente

Password




 
home  
 

Ecology

Preliminary verification of environmental menagement applied by the company (technical-administrative procedure by PGA methodology)
Analysis and eventual predisposition of authorization presewnt in the company (water drain, atmosheric emssions, temporary rubbish deposit, etc)
Draft of a preliminary relation about the characterization of current problems
Qualification and classification of produced rubbish of any nature
Predisposition of charge and discharge books
Periodic verification of compilation procedureof charge and discharge book
Procedures predisposition for periodic control of temporary rubbish deposits
Training/information of emplyed to rubbish menagement
Annual statement (Unique Declarative Form)
Legal survey
Prescriptive consulence in general
Assistence in relationship with Public Offices of supervision


copyright © 2002 - 2008 EcoSicurezza - Privacy - Contacts